
Foundation Work That Keeps Coatings Attached
Concrete surface preparation by Get Floored Epoxy in Shreveport, for long-lasting epoxy and coating performance.
When epoxy or coating systems fail, the problem usually starts with poor surface preparation rather than the coating itself. In Shreveport, concrete slabs often carry old paint, oil stains, or surface contaminants that prevent proper adhesion, leading to peeling or bubbling within months of installation. After proper preparation, you see a clean, profiled surface that allows epoxy to bond chemically and mechanically, creating a finish that stays attached under traffic and use.
Get Floored Epoxy uses mechanical grinding, crack repair, and contaminant removal to prepare your concrete before applying any coating. The process removes weak surface layers, opens the pores of the concrete, and repairs damage that could compromise the final result. Surface preparation is tailored based on slab condition, previous coatings, and the type of system being installed.
If you need concrete prep work in Shreveport before coating installation, contact Get Floored Epoxy to assess your slab and plan the necessary steps.
Grinding and repair create the right surface profile
Your concrete surface preparation in Shreveport starts with mechanical grinding using diamond-grit equipment that removes old coatings, smooths high spots, and creates a textured profile that epoxy can grip. Get Floored Epoxy inspects the slab for cracks, spalling, or low spots, then fills and levels those areas with epoxy-based repair compounds. The grinding process also opens the pores of the concrete, allowing primers and base coats to penetrate and bond properly.
After grinding and repair, you see a uniform, clean surface free of dust, oil, and loose material. The surface profile determines how well the coating bonds, and Get Floored Epoxy adjusts the grinding depth and method based on the coating system being installed. Proper preparation prevents delamination, bubbling, and premature wear, ensuring the coating performs as expected over time.
Get Floored Epoxy uses industrial vacuums to remove dust and debris during the prep process, keeping the work area clean and ready for coating application. The preparation timeline depends on slab size, condition, and the extent of repairs needed, but most projects are completed within one to two days. This step is critical for any epoxy system, and skipping or rushing it compromises the final result regardless of coating quality.
Preparation questions often focus on necessity and timing
Clients frequently ask whether surface preparation is truly necessary, what the process involves, and how long it takes, especially when trying to understand why it adds time and cost to a flooring project.
Surface preparation in Shreveport includes mechanical grinding to remove old coatings and contaminants, repairing cracks and surface damage, and creating a textured profile that allows epoxy to bond. Get Floored Epoxy also cleans the surface thoroughly to remove dust and oils before coating application.
Most prep work in Shreveport takes one to two days, depending on slab size and condition. Extensive repairs or removal of thick old coatings can add time, but the process cannot be rushed without compromising coating performance.
Get Floored Epoxy treats surface preparation as the foundation of every coating project, ensuring your floor performs and lasts as intended. If you are ready to prepare your concrete in Shreveport for a durable epoxy system, contact us to schedule an assessment and begin the process.
